Researchers
Perišić, Martina
Results 21-40 of 69
| Issue Date | Title | Author(s) | Type | Мp-cat. |
|---|---|---|---|---|
| 2024 | Artificial Neural Network Model for Predicting Excavator Downtime | Spasojević Brkić, Vesna | Conference Paper | Mp. category will be shown later |
| 2024 | Dumper Operator’s Workplace Risks: Preliminary Study | Papić, Neda | Conference Paper | Mp. category will be shown later |
| 2024 | COMPARING THE DURATION OF DIFFERENT TYPES OF EXCAVATOR DOWNTIME | Spasojević Brkić, Vesna | Conference Paper | Mp. category will be shown later |
| 2024 | A RISK EVALUATION OF BULLDOZER DOWNTIMES AND ITS ECONOMIC JUSTIFICATION IN OPEN-PIT MINES | Bugarić, Uglješa | Conference Paper | Mp. category will be shown later |
| 2024 | Whole-body vibration measurement at the mining machinery operator's workplace in SMEs![]() | Spasojević-Brkić, Vesna | Conference Paper | Mp. category will be shown later |
| 2023 | Transport and Mining Machinery Foot Controls: Safety and Human Factors View | Spasojević Brkić, Vesna | Conference Paper | Mp. category will be shown later |
| 2023 | Methodology for Analysing Risk Factor on Surface Top Hammer Drill Rig![]() | Brkić, Aleksandar | Article | Mp. category will be shown later |
| 2023 | Differences in Kaizen implementation between countries and industry types in multinational supply chain![]() | Spasojević-Brkić, Vesna | Article | 22M22 |
| 2023 | "Improve" and "Control" tools in assembly of micro components: A case study![]() | Nemanja Janev, N. | Article | 51M51 |
| 2023 | QUANTITATIVE SWOT-TOWS ANALYSIS BASED ON THE ENTREPRENEURS SELF EVALUATION | Mihajlović, Ivan | Conference Paper | Mp. category will be shown later |
| 2023 | QUALITY TOOLS AND METHODOLOGIES INFLUENCING THE INVESTMENT AND DEVELOPMENT PERFORMANCE IN AEROSPACE INDUSTRY COMPANIES OF THE EUROPE AND NORTH AMERICA | Spasojević Brkić, Vesna | Conference Paper | Mp. category will be shown later |
| 2023 | Validating Measurement Structure of Checklist for Evaluating Ergonomics Risks in Heavy Mobile Machinery Cabs![]() | Spasojević-Brkić, Vesna | Article | 21a+M21a+ |
| 2023 | DIFFERENCES BETWEEN BRIDGE AND GANTRY CRANES’ DOWNTIMES | Spasojević Brkić, Vesna | Article | 24+M24+ |
| 2023 | Mining Machinery Downtimes and Operators' Attitudes on Safety and Health at Work: Example of Wheel Loader | Misita, Mirjana | Conference Paper | Mp. category will be shown later |
| 2023 | PREDICTION OF THE CHANGE IN NUMBER OF EMPLOYEES IN SERBIAN COMPANIES BASED ON CONTINGENCY AND QUALITY MANAGEMENT FACTORS | Perišić, Natalija | Conference Paper | Mp. category will be shown later |
| 2023 | MINING MACHINES' DOWNTIME/FAILURE LEVEL OF DANGER OF CONSEQUENCES AND ESTIMATED RISK OF FAILURE – PRELIMINARY RESEARCH | Perišić, Martina | Conference Paper | Mp. category will be shown later |
| 2023 | PRODUCTION PLANNING AND “DEFINE, MEASURE AND ANALYSIS“ TOOLS IN AUTOMOTIVE INDUSTRY AS PREREQUISITE OF AUTOMATION: A CASE STUDY![]() | Nemanja Janev | Conference Paper | Mp. category will be shown later |
| 2023 | SAFETY COMMUNICATION IN MINING COMPANIES: DIFFERENCES ACROSS ORGANIZATIONAL STRUCTURE | Spasojević Brkić, Vesna | Article | 51M51 |
| 2022 | Reliability and validity of organizational factors measurement in risk management of process industry equipment | Golubović, Tamara A.; Spasojević Brkić, Vesna | Article | 51M51 |
| 2022 | Dump Truck Efficiency and Risk Maps: Case Study | Misita, Mirjana | Conference Paper | Mp. category will be shown later |
