Researchers
Perišić, Martina
Results 41-60 of 69
| Issue Date | Title | Author(s) | Type | Мp-cat. |
|---|---|---|---|---|
| 2022 | Transport and Mining Machines Operators’ Behavioral Attitudes in Safety Climate Context | Spasojević-Brkić, Vesna | Article | 24+M24+ |
| 2022 | Comparison of Failure Duration and Failure Frequency of Mining Machines Using The Kruskal-Wallis H Test (One-Way Anova On Ranks) - Preliminary Research | Perišić, Martina | Conference Paper | Mp. category will be shown later |
| 2022 | Differences in attitudes of operators and managers on risk management of pressure equipment![]() | Golubović, Tamara | Article | 22M22 |
| 2022 | Crane stoppages risk assessment![]() | Brkić, Aleksandar | Article | 22M22 |
| 2022 | Risk Management and Excavator Downtime Analysis![]() | Spasojević Brkić, Vesna | Conference Paper | Mp. category will be shown later |
| 2022 | Contigency of employees' training | Janev, Nemanja | Conference Paper | Mp. category will be shown later |
| 2022 | Managers safety attitudes as organizational factors and pressure equipment risk predictor | Golubović, Tamara; Spasojević Brkić, Vesna | Article | 22M22 |
| 2022 | Comparison of failure duration and faailure frequency of mining machines using the Kruskal-Wallis H test (one-way ANOVA on ranks) - preliminary research | Perišić, Martina | Conference Paper | Mp. category will be shown later |
| 2022 | Model analize rada dampera i ekspertni sistem HAMRISK | Misita, Mirjana | Article | 51M51 |
| 2022 | Pareto analysis in bulldozer’s failures and stoppages risk management | Spasojević Brkić, Vesna | Article | 51M51 |
| 2022 | Serbian and Libyan Anthropometric Measurements Data in Contemporary Systems’ Design | Spasojević Brkić, Vesna | Conference Paper | Mp. category will be shown later |
| 2022 | Risk Assessment of Backhoe Loader Downtimes | Misita, Mirjana | Conference Paper | Mp. category will be shown later |
| 2022 | The Role of Bioeconomy in the Future Energy Scenario: A State-of-the-Art Review | Perišić, Martina | Article | 21M21 |
| 2022 | Identification and analysis of the risk of down time in the operational work of bulldozers![]() | Brkić, Aleksandar | Conference Paper | Mp. category will be shown later |
| 2022 | Evaluation of the HAMRISK Expert System by Hierarchical Structuring of Criteria | Misita, Mirjana | Conference Paper | Mp. category will be shown later |
| 2021 | Research on risk prioritization at hydraulic excavator using fuzzy FMEA method![]() | Misita, Mirjana | Conference Paper | Mp. category will be shown later |
| 2021 | Risk management practice and orders fulfillment in Serbian companies![]() | Algheriani, Nuri Saad Mohamed; Algheriani, Nuri mohamed saad; Spasojević-Brkić, Vesna | Conference Paper | Mp. category will be shown later |
| 2021 | Primena novog integrisanog modela za upravlajnje rizikom - poređenje proizvodnih i uslužnih preduzeća | Alheriani, Nuri Mohamed Saad; Spasojević Brkić, Vesna | Article | 51M51 |
| 2021 | Decision support system for risk prioritization in transport and mining machines | Misita, Mirjana | Conference Paper | Mp. category will be shown later |
| 2021 | EVALUATION OF ERGONOMIC CHARACTERISTICS OF CRANE CABIN SEAT | Spasojević Brkić, Vesna | Conference Paper | Mp. category will be shown later |
