| Issue Date | Title | Author(s) | Type | Мp-cat. |
|---|---|---|---|---|
| 2018 | Development of the program for dimensioning and selection of the dewatering objects and equipment for open pit dewatering | Stojković, Pavle Z. | Conference Paper | Mp. category will be shown later |
| 2018 | Procedure for management of self-contained self-rescuer as a waste in underground coal mining | Ivaz, Jelena S. | Conference Paper | Mp. category will be shown later |
| 2017 | Asbestos waste management procedures at the Technical faculty in Bor | Ivaz, Jelena S. | Conference Paper | Mp. category will be shown later |
| 2017 | Presentation and analysis of injuries in lignite mine Lubnica on a GIS model | Ivaz, Jelena S. | Conference Paper | Mp. category will be shown later |
| 2017 | ANALYSIS OF HYDRAULIC SHOVEL AVAILABILITY AND UTILIZATION AT VELIKI KRIVELJ SURFACE MINE | Žikić, Miodrag I. | Conference Paper | Mp. category will be shown later |
| 2017 | Reclamation of Veliki Krivelj mine waste dump Saraka potok – successfulness analysis | Žikić, Miodrag I. | Conference Paper | Mp. category will be shown later |
| 2017 | Asbestos waste management procedures at the Tehnical faculty in Bor![]() | Ivaz, Jelena | Conference Paper | Mp. category will be shown later |
| 2017 | GIS design of the underground coal mines | Ivaz, Jelena S. | Conference Paper | Mp. category will be shown later |
| 2016 | Damage claims – the importance of expert witnesses | Stojadinović, Saša | Conference Paper | Mp. category will be shown later |
| 2016 | Optimization the final contour of the open pit North mining district using the software package Whittle | Kržanović, Daniel | Conference Paper | Mp. category will be shown later |
| 2016 | Oprimization the final contour of the open pit North mining district using the software package Whittle | Rajković, Radmilo | Conference Paper | Mp. category will be shown later |
| 2016 | ANALYSIS OF OPERATIONAL TRUCK TIRE LIFE AT VELIKI KRIVELJ OPEN PIT COPPER MINE | Žikić, Miodrag I. | Conference Paper | Mp. category will be shown later |
| 2016 | STANDARDIZED CONDITIONS FOR PRODUCTION AND DISTRIBUTION OF COPPER REFINERY SLAG ABRASIVES – CASE STUDY BOR | Žikić, Miodrag | Conference Paper | Mp. category will be shown later |
| 2016 | Treatment of used tires within the RTB Bor-group | Žikić, Miodrag | Conference Paper | Mp. category will be shown later |
| 2016 | Costs of norm materials and their percent in the ore excavation expenses | Petrović, Dejan | Conference Paper | Mp. category will be shown later |
| 2016 | Cerovo copper mines controlled blasting design | Stojadinović, Saša | Conference Paper | Mp. category will be shown later |
| 2015 | Effects of service smelting of imported copper concentrate in the new smelter of RTB Bor | Milinko Živković; Blagoje Spaskovski; Stojadinović, Saša | Conference Paper | Mp. category will be shown later |
| 2015 | Prediction of flyrock launch velocity using artificial neural networks | Stojadinović, Saša | Article | 21M21 |
| 2015 | Definition of controlled blasting zones at Juzni revir open pit copper mine Majdanpek | Stojadinović, Saša | Conference Paper | Mp. category will be shown later |
| 2015 | Analysis of the feasibility of application of combined ore haulage at future surface mine Kraku Bugaresku cementacija-2 | Žikić, Miodrag | Conference Paper | Mp. category will be shown later |