Search




Research outputs

Rail Projects Ranking Under Fuzzy Environment. Serbian Rail Projects Case Study   [2019]

Macura, Dragana  ; Kapetanovic, Marko V ; Knezevic, Nikola Lj  ; Bojovic, Nebojsa J  

A Model for Prioritization of Rail Infrastructure Projects Using Anp   [2011]

Bojović, Nebojša  ; Bošković, Branislav  ; Macura, Dragana  ; Milenković, Miloš  

Moving revenue risk to operators in gross cost contracts. The Serbian experience   [2018]

Bajčetić, Stanko A.  ; Tica, Slaven M.  ; Živanović, Predrag V.  ; Milovanović, Branko M.  ; Nađ, Andrea M.  

Firm Specific Profitability Determinants of the Transportation Industry: Evidence from Serbia   [2020]

Milenković, Nada  ; Kalaš, Branimir  ; Andrašić, Jelena  ; Jakšić, Dejan  ; Mirović, Vera  

Effects on Airline Costs of Different Air traffic Management Scenarios: An Assessment Method Based on Fast-time Simulation Outputs   [2010]

Jovanović, Radosav  ; Babić, Obrad ; Tošić, Vojin ; Lorenzo Castelli

Can process and lean thinking optimize order picking performance?   [2020]

Sanja Dalton  ; Stošić, Biljana A.  

Reservation system with variable capacity – Case study of Serbian Railways   [2016]

Šelmić, Milica  ; Macura, Dragana  ; Teodorović, Dušan 

Filters

By type