Резултати
eNauka >
Results >
New Temporary Bridge Across the Danube River in Novi sad - Geotechnical Foundation Problems
| Title: | New Temporary Bridge Across the Danube River in Novi sad - Geotechnical Foundation Problems | Authors: | Dragoslav Rakić |
Issue Date: | 2002 | Publication: | 12th Danube-European Conference-Geotechnical Engineering, Passau, Deutsche | Publisher: | Interbational Society for Soil Mechanics and Geotechnical Engineering | Type: | Conference Paper | ISBN: | 3-7739-5973-7 Search Idenfier |
URI: | https://dr.rgf.bg.ac.rs/s/repo/item/10777 https://enauka.gov.rs/handle/123456789/1027286 |
M-category: | Mp. category will be shown later |
Items in eNauka are protected by copyright, with all rights reserved, unless otherwise indicated.