Results
eNauka >
Results >
The impact of an error in selection the pushbacks in the long-term planning of the open pit production on project quality, case study: Open pit Veliki Krivelj, Bor, Serbia
| Title: | The impact of an error in selection the pushbacks in the long-term planning of the open pit production on project quality, case study: Open pit Veliki Krivelj, Bor, Serbia | Authors: | Kržanović, Daniel |
Issue Date: | 2023 | Publication: | Mining and Metallurgy Engineering Bor | ISSN: | 2334-8836 Mining and Metallurgy Engineering Bor Search Idenfier |
Publisher: | Mining and Metallurgy Institute Bor | Type: | Article | Collation: | br. 1 str. 1-6 | DOI: | 10.5937/mmeb2301001K | VBS COBISS: | 195833609 | URI: | https://plus.cobiss.net/cobiss/sr/sr/bib/195833609#izum.si https://enauka.gov.rs/handle/123456789/1042205 |
URL: | https://irmbor.co.rs/casopis/mining-and-metallurgy-engineering-bor/ | M-category: | 52M52 |
Items in eNauka are protected by copyright, with all rights reserved, unless otherwise indicated.