Results
eNauka >
Results >
Stripping delay analysis in relation to designed long-term plan of excavation at the open pit Veliki Krivelj
| Naziv: | Stripping delay analysis in relation to designed long-term plan of excavation at the open pit Veliki Krivelj | Autori: | Vaduveskovic, Zoran; Bugarin, Mile |
Godina: | 2013 | Publikacija: | Mining and Metallurgy Engineering Bor | ISSN: | 2334-8836 Mining and Metallurgy Engineering Bor Pretraži identifikator |
Tip rezultata: | Naučni članak | Kolacija: | br. 2 str. 33-52 | DOI: | 10.5937/mmeb1302033v | URI: | https://enauka.gov.rs/handle/123456789/301343 | Izvor metapodataka: | Migrirano iz RIS podataka | M-kategorija: | Mp kategorija će biti prikazana naknadno. |
Items in eNauka are protected by copyright, with all rights reserved, unless otherwise indicated.