Results
eNauka >
Results >
Project Scheduling Method with Time Using Mrp System–A Case Study: Construction Project in Libya
Title: | Project Scheduling Method with Time Using Mrp System–A Case Study: Construction Project in Libya | Authors: | Imetieg, Ali; Lutovac, Miroslav | Issue Date: | 2015 | Publication: | The European Journal of Applied Economics | ISSN: | 2406-2588 The European Journal of Applied Economics Search Idenfier | Type: | Article | Collation: | vol. 12 br. 1 str. 58-66 | DOI: | 10.5937/ejae12-7815 | URI: | https://enauka.gov.rs/handle/123456789/383937 http://ezaposleni.singidunum.ac.rs/rest/sciNaucniRezultati/oai/record/2/3244 |
URL: | http://www.degruyter.com/view/j/sjas.2015.12.issue-1/ejae12-7815/ejae12-7815.xml | Metadata source: | Migracija | M-category: | 52M52 |
Items in eNauka are protected by copyright, with all rights reserved, unless otherwise indicated.