Rezultati
eNauka >
Rezultati >
Geotechnical conditions of “Debelo brdo” tunnel construction on the highway E-80: Nis-Merdare-Pristina (“Peace Highway”)
| Naziv: | Geotechnical conditions of “Debelo brdo” tunnel construction on the highway E-80: Nis-Merdare-Pristina (“Peace Highway”) | Autori: | Dragoslav Rakić |
Ostala autorstva: | Nuno Guerra; Manuel Matos Fernandes; Cristiana Ferreira; Alexandre Pinto; Pedro Seco e Pinto | Godina: | 2024 | Publikacija: | Proceedings of the XVIII ECSMGE 2024 GEOTECHNICAL ENGINEERING CHALLENGES TO MEET CURRENT AND EMERGING NEEDS OF SOCIETY, Lisbon, 26-30 August 2024 | Izdavač: | CRC Press | Tip rezultata: | Konferencijski rad | ISBN: | 978-1-032-54816-6 Pretraži identifikator |
Kolacija: | str. 1901-1904 | DOI: | 10.1201/9781003431749-356 | URI: | http://dr.rgf.bg.ac.rs/s/repo/item/8779 https://enauka.gov.rs/handle/123456789/932118 |
M-kategorija: | Mp kategorija će biti prikazana naknadno. |
Rezultati na eNauka su zaštićeni autorskim pravima i sva prava su zadržana, osim ako nije drugačije naznačeno.