Results
eNauka >
Results >
Installation of Preventive in the Phase of Technical System Designin Order to Reduce the Harmfull Effects Caused by Floods
| Title: | Installation of Preventive in the Phase of Technical System Designin Order to Reduce the Harmfull Effects Caused by Floods | Authors: | Katić, Aleksandar; Ćosić, Đorđe |
Issue Date: | 2011 | Publication: | International Conference of the Series Man and Working Environment Safety of Technical Systems in Living and Working Environment (16 ; 2011 ; Niš), Niš, 27-28 October 2011. | Publisher: | Niš : Faculty of Occupational Safety | Type: | Conference Paper | ISBN: | 978-86-6093-035-6 Search Idenfier |
Collation: | str. 119-123 | URI: | https://enauka.gov.rs/handle/123456789/477911 | URL: | https://www.znrfak.ni.ac.rs/SERBIAN/009-NAUKA/IZDAVASTVO-UDZBENICI/Ivan%20Krstic%20-%20Profesionalni%20rizik/STS%202011.pdf | Metadata source: | Migrirano iz RIS podataka | Availability note: | Подаци и/или пуни текст су непотпуни | M-category: | Mp. category will be shown later |
Items in eNauka are protected by copyright, with all rights reserved, unless otherwise indicated.