Rezultati

eNauka >  Rezultati >  Installation of Preventive in the Phase of Technical System Designin Order to Reduce the Harmfull Effects Caused by Floods
Naziv: Installation of Preventive in the Phase of Technical System Designin Order to Reduce the Harmfull Effects Caused by Floods
Autori: Katić, Aleksandar; Ćosić, Đorđe  
Godina: 2011
Publikacija: International Conference of the Series Man and Working Environment Safety of Technical Systems in Living and Working Environment (16 ; 2011 ; Niš), Niš, 27-28 October 2011.
Izdavač: Niš : Faculty of Occupational Safety
Tip rezultata: Konferencijski rad
ISBN: 978-86-6093-035-6 Pretraži identifikator
Kolacija: str. 119-123
URI: https://enauka.gov.rs/handle/123456789/477911
URL: https://www.znrfak.ni.ac.rs/SERBIAN/009-NAUKA/IZDAVASTVO-UDZBENICI/Ivan%20Krstic%20-%20Profesionalni%20rizik/STS%202011.pdf
Izvor metapodataka: Migrirano iz RIS podataka
Napomena o dostupnosti: Подаци и/или пуни текст су непотпуни
M-kategorija: 
Mp kategorija će biti prikazana naknadno.

Pronađi DOI


Google ScholarTM

Rezultati na eNauka su zaštićeni autorskim pravima i sva prava su zadržana, osim ako nije drugačije naznačeno.